1)
How many nodes are there at the end of a Cox-Ross-Rubinstein five-step binomial
tree?
A)
4
B)
5
C)
6
D)
7
2)
Which of the following cannot be estimated from a single binomial tree?
A)
delta
B)
gamma
C)
theta
D)
vega
3)
Which of the following is true for u in a Cox-Ross-Rubinstein binomial tree?
A)
It depends on the interest rate and the volatility
B)
It depends on the volatility but not the interest rate
C)
It depends on the interest rate but not the volatility
D)
It depends on neither the interest rate nor the volatility
4)
How many different paths are there through a Cox-Ross-Rubinstein tree with
four-steps?
A)
5
B)
9
C)
12
D)
16
5)
When we move from assuming no dividends to assuming a constant dividend yield,
which of the following is true for a Cox, Ross, Rubinstein tree?
A)
The parameters u and p change
B)
p changes but u does not
C)
u changes but p does not
D)
Neither p nor u changes
6)
When the stock price is 20 and the present value of dividends is 2, which of
the following is the recommended way of constructing a tree?
A)
Draw a tree for an initial stock price of 20 and subtract the present value of
future dividends at each node
B)
Draw a tree for an initial stock price of 22 and subtract the present value of
future dividends at each node
C)
Draw a tree with an initial stock price of 18 and add the present value of
future dividends at each node
D)
Draw a tree with an initial stock price of 18 and add 2 at each node
7)
What is the recommended way of making interest rates a function of time in a
Cox, Ross, Rubinstein tree?
A)
Make u a function of time
B)
Make p a function of time
C)
Make u and p a function of time
D)
Make the lengths of the time steps unequal
8)
What is the recommended way of making volatility a function of time in a Cox,
Ross, Rubinstein tree?
A)
Make u a function of time
B)
Make p a function of time
C)
Make u and p a function of time
D)
Make the lengths of the time steps unequal
9)
A binomial tree prices an American option at $3.12 and the corresponding
European option at $3.04. The Black-Scholes price of the European option is
$2.98. What is the control variate price of the American option?
A)
$3.06
B)
$3.18
C)
$2.90
D)
$3.08
10)
The chapter discusses an alternative to the Cox, Ross, Rubinstein tree. In this
alternative, which of the following are true?
A)
The relationship between u and d is: u=1/d
B)
The relationship between u and d is: u-1=1-d
C)
The probabilities on the tree are all 0.5
D)
None of the above
11)
Which of the following cannot be valued by simulating paths through a tree in
the way described in the chapter?
A)
European options
B)
American options
C)
Asian options (i.e., options on the average stock price)
D)
An option which provides a payoff of $100 if the stock price is greater than
the strike price at maturity
12)
For an option on futures, the volatility is 35%, the time step is three months,
and the risk-free rate is 5%. What is the Cox, Ross, Rubinstein parameter, u?
A)
1.34
B)
1.29
C)
1.09
D)
1.19
13)
For an option on futures, the volatility is 35%, the time step is three months,
and the risk-free rate is 5%. What is the Cox, Ross, Rubinstein parameter, p?
A)
0.52
B)
0.46
C)
0.48
D)
0.50
14)
When the volatility of an option increases from 30% to 32% the value of the
option increases from $2.00 to $2.40. What is the vega of the option?
A)
0.20 dollars per %
B)
0.50 dollars per %
C)
0.80 dollars per %
D)
2.00 dollars per %
15)
The values of a stock price at the end of the second time step are $80, $100,
$125. The corresponding values of an option are $0, $5, and $20 respectively.
What is an estimate of gamma?
A)
0.136
B)
0.146
C)
0.156
D)
0.166
16)
What is the difference between valuing an American and a European option using
a tree?
A)
The value of u is higher for American options
B)
The value of u is lower for American options
C)
The time steps for American options are not equal
D)
It is necessary to do two calculations at nodes where the option is in the
money
17)
A European option on a stock with known dollar dividend is valued by setting
the stock price variable equal to the stock price minus the present value of
the dividend in the Black-Scholes-Merton formula. A second price can be
obtained using the tree building procedure in the chapter. Which of the
following is true when a very large number of time steps are used in the tree?
A)
The first price is higher than the second price
B)
The first price is lower than the second price
C)
The first price is sometimes higher and sometimes lower than the second price
D)
The two prices are almost exactly the same
18)
Which of the following is possible in a modified Cox, Ross, Rubinstein binomial
tree?
A)
The interest rate and volatility can both be functions of time
B)
The interest rate or the volatility can be a function of time, but not both
C)
The interest rate can be a function of time but the volatility cannot
D)
The interest rate and volatility must be constant
19)
Which of the following describes the way that the parameters in a binomial tree
are chosen?
A)
The expected return during each time step is the risk-free rate
B)
The standard deviation of the return in each time step is, for small time
steps, almost exactly equal to the volatility per annum times the square root
of the length on the time step in years
C)
The tree recombines
D)
All of the above
20)
Which of the following can be valued without using a numerical procedure such
as a binomial tree?
A)
American put options on a non-dividend paying stock
B)
American call options on a non-dividend paying stock
C)
American call options on a currency
D)
American put options on futures
π¦πΊ Writing for Australian Universities
- AGLC4 (law), APA 7th, Harvard (Business), Vancouver (Health Sciences)
- Grading: HD (85-100%), D (75-84%), C (65-74%), P (50-64%)
- UniMelb, UNSW, ANU, Monash, UQ, UWA standards covered
- Australia uses British English spelling conventions
- Turnitin is widely used β all work is checked before delivery
Australia Pricing Guide
How It Works β 3 Simple Steps
Fill In Your Order Form
Provide your topic, academic level, deadline, referencing style, and any specific instructions or rubric criteria.
Get Matched with a Writer
We assign the best-qualified expert in your subject, familiar with Australia university requirements.
Receive & Review
Download your plagiarism-free paper, review it, and request any free revisions within 14 days if needed.
Frequently Asked Questions
Is this service plagiarism-free?
Yes. Every paper is written from scratch by a human expert to your specific instructions. We run all papers through professional plagiarism detection software and can include a Turnitin-equivalent report on request.
Do your writers know Australia academic standards?
Yes. Our writers are familiar with Australia's university systems, citation styles, and marking conventions. You'll get a paper that meets your institution's exact expectations.
What citation styles do you support for Australia?
We support all major citation styles required by Australia universities, including APA 7th, Harvard, Chicago/Turabian, MLA, OSCOLA, Vancouver, and IEEE.
Can you write just one chapter of my dissertation?
Yes. We write individual dissertation chapters β literature reviews, methodology, data analysis, introductions, conclusions β or the full manuscript from proposal to defence-ready submission.